 |
 |
 |
 |
 |
 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Water will be supplied through a series of deep (300 meter) wells. These wells will utilize a well-head type chlorinating process and the water will be pumped and transported to the water supply plant via a poly-vinyl-chloride plastic (PVC) well collection network. The water supply plant will be centrally located along the western boundary of the overall site. This facility will include hydro-pneumatic pressure tanks and ground storage tanks. A series of booster pumps will boost the pressure in the system and pump the water through a series of water distribution lines to individual housing units.
|
|
|
|
|
|
|
|
|
|
|
|
The Gas and Electric Utility
|
|
|
|
|
|
|
|
|
|
|
|
|
The Estate will have its own separate gas and electric power plant and will be responsible for conducting all maintenance on the facility. An adequate inventory of spare parts will be kept on hand to cope with emergency situations. A series of electrical generators will be linked together to provide adequate power and insure constant power for 24 hours a day even if any one generator falters.
|
|
|
|
|
|
|
|
|
|
|
|
Garbage and Solid Waste Management
|
|
|
|
|
|
|
|
|
|
|
|
|
A coordinated garbage and solid waste management system will be provided for all residents and businesses within the Estate. A regular schedule of pick-ups will be maintained and waste will be taken to an off site landfill.
|
|
|
|
|
|
|
|
|
|